
The Fort Wayne Street Department utilizes its own asphalt plant to produce "hot mix" asphalt for routine road maintenance. This asphalt is used for patching potholes as well as other asphalt related projects. During the winter months when we are unable to run our plant, a product referred to as "cold mix" is used for patching.
The city is divided into two (2) sections North and South. A procedure is used to ensure all city streets are patched on a regular basis when needed. Potholes can also be reported by citizens to the 311 call center from 7:30 a.m. to 5:30 p.m. weekdays at either 311 or 427-8311.
See below lists completed by the Street Department:
Paved streets:
Chip & Seal streets:
Board of Public Works
260-427-1112
City Engineer
260-427-1172
Fleet Management
260-427-5294
Flood Control
260-427-1250
Right-Of-Way
260-427-6155
Solid Waste Management
260-427-8311
Street Department
260-427-8311
Traffic Engineering
260-427-1172
Transportation Engineering Services
260-427-1172