Event/Project |
Impact on River Level |
Project Owner/Type |
Date of Possible River Level Impact |
|||
|
Thieme Drive Flood Control |
|
Uncertain if river levels will be required to be adjusted. |
|
Public Works -Flood Control/Army Corps of Engineers |
|
Project is expected to be in construction in June 2010. |
|
Clinton Street Bridge replacement |
|
Uncertain if river levels will be required to be adjusted. |
|
Public Works - Transportation |
|
Project is expected to be under construction July – November 2010. |
|
Tecumseh Street Bridge renovation |
|
Uncertain if river levels will be required to be adjusted. |
|
Allen County Highway |
|
|
|
Ewing Street Bridge improvements |
|
Uncertain if river levels will be required to be adjusted. |
|
Allen County Highway |
|
|
|
Van Buren Street Bridge Improvements |
|
Uncertain if river levels will be required to be adjusted. |
|
Allen County Highway |
|
|
|
Water Filtration Plant reservoir renovations
|
|
This project will require that the gate at the Hosey Dam be opened and rivers lowered below normal summer pool while work is being done. |
|
City Utilities - Drinking Water |
|
This will not occur in 2010 until after the Hosey Dam gate is opened in October |
|
Duck and Barr Street sewer improvement |
|
|
|
City Utilities - Combined Sewer System and Stormwater
|
|
After October 15, 2010 |