River Levels River level planned projects

Planned Projects

Event/Project

 

Impact on River Level

 

Project Owner/Type

 

Date of Possible River Level Impact

Thieme Drive Flood Control

 

Uncertain if river levels will be required to be adjusted.

 

Public Works -Flood Control/Army Corps of Engineers

 

Project is expected to be in construction in June 2010. 

Clinton Street Bridge replacement

 

 Uncertain if river levels will be required to be adjusted.

 

Public Works - Transportation

 

Project is expected to be under construction July – November 2010. 

Tecumseh Street Bridge renovation

 

Uncertain if river levels will be required to be adjusted.

 

Allen County Highway 

 

 

Ewing Street Bridge improvements

 

Uncertain if river levels will be required to be adjusted.

 

Allen County Highway 

 

 

Van Buren Street Bridge Improvements

 

Uncertain if river levels will be required to be adjusted.

 

Allen County Highway 

 

 

Water Filtration Plant reservoir renovations

 

 

This project will require that the gate at the Hosey Dam be opened and rivers lowered below normal summer pool while work is being done.

 

City Utilities - Drinking Water

 

This will not occur in 2010 until after the Hosey Dam gate is opened in October

Duck and Barr Street sewer improvement

 

 

 

City Utilities - Combined Sewer System and Stormwater

 

 

After October 15, 2010