Type NumberTitleDate Revised
dwf_reduced SW-1 Swale Underdrain October 30, 2015 
dwf_reduced SW-2 Curb Underdrain October 28, 2015 
dwf_reduced SW-3 Waterway Cross-Section October 30, 2015 
dwf reduced SW-4 Typical Placement Of Inlets At Intersections May 22, 2015
  dwf reduced  SW-5-1 Trench Drain I August 5, 2014
  dwf reduced  SW-5-2 Trench Drain II August 5, 2014
dwf reduced SW-6 Ditch Details  October 28, 2015