This library contains documents generated and maintained by Fort Wayne City Utilities.

Type   Number Title Release Date
pdf-15 dwf reduced VEG-1 Rain Garden Planting Details May 22, 2015
pdf-15 dwf reduced VEG-2 Tree Root Protection May 22, 2015
pdf-15 dwf reduced VEG-3 Transplanted Tree Planting May 22, 2015

City Utilities has standardized and updated its process for the development and use of Master Specifications as part of City Utilities projects. pdfLearn more.....

The Master Specifications below were finalized and approved as of June 20, 2017.  A few have been updated as of September 14, 2017.

zipMaster Specifications as of 6-20-2017 -- zipped file includes all documents shown below

word icon small01 11 21  Miscellaneous Work Items

word icon small01 31 19.13  Pre-Construction Meetings

word icon small01 31 19.23  Progress Meetings

word icon small01 32 16  Construction Progress Schedule

word icon small01 33 00   Submittal Procedures

word icon small01 52 03  Common Construction Facilities

word icon small01 52 05  Detailed Construction Facilities

word icon small01 55 26  Maintenance and Protection of Traffic

word icon small01 57 00  Temporary Controls

word icon small01 57 13  Erosion and Sedimentation Control

word icon small01 65 00  Product Delivery Requirements

word icon small01 66 00  Product Storage and Handling Requirements

word icon small01 71 16.13 Video Documentation of Conditions

word icon small01 71 23  Field Engineering

word icon small01 71 33  Protection of the Work and Property

word icon small01 75 11  Checkout and Startup Procedures

word icon small01 77 00  Closeout Procedures

word icon small01 78 23  Operations and Maintenance Data

word icon small01 78 39  Project Record Documents

word icon small03 00 05  Concrete

word icon small05 56 00  Metal Castings

word icon small26 05 05  General Provisions for Electrical Systems

docx26 05 13 Medium Voltage Cables

docx26 05 19 Low Voltage Electrical Power Conductors and Cables

docx26 05 23 Instrumentation and Communication Cable

word icon small26 05 26  Grounding and Bonding for Electrical Systems

word icon small26 05 29  Hangers and Supports for Electrical Systems

word icon small26 05 33  Raceways and Boxes for Electrical Systems

word icon small26 05 43  Underground Ducts and Raceways for Electrical Systems

docx26 05 53 Identification for Electrical Systems

word icon small26 09 13  Electrical Power Monitoring

word icon small26 12 00  Medium Voltage Transformers

word icon small26 22 00  Low Voltage Transformers

word icon small26 24 13  Switchboards

word icon small26 24 16  Panelboards

word icon small26 24 19  Motor Control Centers

word icon small26 28 16  Enclosed Switches and Circuit Breakers

word icon small26 29 23 Low Voltage Variable Frequency Drives

docx26 29 37 Low Voltage Motor Starters

word icon small26 51 00  Interior Lighting

word icon small26 56 00  Exterior Lighting

docx27 00 00 Communications

doc27 05 53 Identification for Communication Systems

doc27 11 16 Communication Enclosures

doc27 13 24 Fiber Optic Cable and Appurtenances

doc27 15 13 Copper Cable and Appurtenances

word icon small31 00 05  Trenching and Earthwork

word icon small31 05 19  Geosynthetics for Earthwork

word icon small31 11 00  Clearing and Grubbing

word icon small31 36 10  Gabions and Revetment Mattresses

word icon small 32 12 16 Asphalt Paving

word icon small32 13 00  Rigid Paving

word icon small32 13 43  Pervious Rigid Paving

word icon small32 16 00 Curbs, Gutters, Sidewalks, Ramps and Driveways

word icon small32 92 00  Lawns and Grasses

docx33 01 30.73 Pipe Rehabilitation by Cured In Place Lining

word icon small33 01 30.74  Pipe Repair and Replace by Open Excavation

word icon small33 01 30.78  Rehabilitation of Sewer Manholes

word icon small33 05 13.29  Fiberglass Manholes and Structures

word icon small33 05 23.13  Utility Horizontal Directional Drilling

word icon small33 05 23.16  Utility Pipe Jacking

docx33 05 33  Ductile Iron Pressure Utility Piping

word icon small33 05 33.13  Ductile Iron Non-Pressure Utility Piping

word icon small33 05 34.13  Concrete Non-Pressure Utility Piping

docx33 05 34.15  Concrete Pressure Utility Piping

word icon small33 05 37.13  PVC Non-Pressure Utility Piping

word icon small33 05 37.16  PVC Pressure Utility Piping

word icon small33 05 38.13  HDPE Non-Pressure Utility Piping

docx33 05 38.16 HDPE Pressure Utility Piping

word icon small33 05 39  FRP Non-Pressure Utility Piping

word icon small33 05 41 CMP Non-Pressure Utility Piping

word icon small33 05 51  PP Non-Pressure Utility Piping

docx33 11 00 Water Piping Installation

docx33 12 00 Water Appurtenances

word icon small33 31 00  Sanitary Sewer Piping Installation

docx33 32 19 Public Utility Wastewater Pumping Stations

word icon small33 39 13  Sanitary Utility Sewerage Manholes

word icon small33 41 00  Storm Utility Piping Installation

word icon small33 44 13  Drainage Structures

word icon small33 46 16.19  Pipe Underdrains

word icon small33 47 32  Rain Garden Construction

word icon small33 49 13  Storm Drainage Manholes

word icon small40 05 06 Couplings, Adapters, and Specials for Process Piping 

docx40 61 13 Process Control Systems General Provisions

docx40 61 16 Process Control Narrative

word icon small40 61 63 Process Control System- Training 

docx40 61 93 Process Control System- Input/Output List

xlsx40 61 93 Schedules IO List

doc40 64 00 Programable Logic Controllers

docx40 67 03 Control System Equipment Panel Construction

docx40 67 06 Misc. Control Panel Devices

docx40 7x xx Template for Instrumentation

 Pump Station Layout
Type   Number Title Release Date
pdf-15 dwf_reduced PS-1 Lift Station Meter Pit January 5, 2015 
pdf-15 dwf_reduced PS-2 Lift Station By-pass (Portable Pump Connection) May 22, 2015 

Type NumberTitleRelease Date
pdf-15 dwf_reduced EROS-1 Temporary Construction Entrance February 9, 2015
pdf-15 dwf_reduced EROS-2-1 Temporary Perimeter Protection Silt Fence July 1, 2013
pdf-15 dwf_reduced EROS-2-2 Temporary Perimeter Protection Filter Sock August 9, 2013
pdf-15 dwf_reduced EROS-3-1 Concrete Washout - Above Grade August 9, 2013
pdf-15 dwf_reduced EROS-3-2 Concrete Washout - Below Grade August 9, 2013
pdf-15 dwf_reduced EROS-4-1 Erosion Control Blankets - Channel October 30, 2015
pdf-15 dwf_reduced EROS-4-2 Erosion Control Blankets - Slope August 9, 2013
pdf-15 dwf_reduced EROS-4-3 Erosion Control Blankets - Shoreline August 9, 2013
pdf-15 dwf_reduced EROS-5 Temporary Rock Check Dam August 9, 2013 
pdf-15 dwf_reduced EROS-6-1 Temporary Inlet Protection - Geotextile Fabric July 1, 2013
pdf-15 dwf_reduced EROS-6-2 Temporary Inlet Protection - Sediment Control Sack August 9, 2013
pdf-15 dwf_reduced EROS-6-3 Temporary Inlet Protection - Stone Bags Ring - Sump August 9, 2013
pdf-15 dwf_reduced EROS-6-4 Temporary Inlet Protection - Stone Bags Ring - Sump with Curb August 9, 2013
pdf-15 dwf_reduced EROS-6-5 Temporary Inlet Protection - Stone Bags - Slope Gradient with Curb August 9, 2013
pdf-15 dwf_reduced EROS-6-6 Temporary Inlet Protection - Filter Sock August 9, 2013
pdf-15 dwf_reduced EROS-6-7 Temporary Inlet Protection - Straw Bales October 30, 2015
pdf-15 dwf_reduced EROS-7 Temporary Sediment Trap August 9, 2013
pdf-15 dwf_reduced EROS-8 Temporary Sediment Control Dewatering Bag July 1, 2013
pdf-15 dwf_reduced EROS-9-1 Temporary River/Lake Shore Protection - Coir Logs July 1, 2013
pdf-15 dwf reduced EROS-9-2  River/Lake Shore Protection Gabions May 19, 2015 
pdf-15 dwf reduced EROS-9-3  Rver/Lake Shore Protection Gabions on Gabion Mattress May 19, 2015
pdf-15 dwf reduced EROS-9-4 River/Lake Shore Protection Gabions Next To Gabion Mattress May 19, 2015
pdf-15 dwf_reduced EROS-10 Temporary 48" Construction Fence July 2, 2013

 

 

Type NumberTitleRelease Date
dwf_reduced BS-1 Recommended Utility Placement in Public Right-of-Way Jan 24, 2017
dwf_reduced BS-2 Recommended Utility Placement in Back to Back Easement Jan 24, 2017
dwf_reduced BS-3 Recommended Utility Placement in Existing Perimeter Easement Jan 24, 2017
dwf_reduced BS-4 General Rigid Pipe Bedding Detail Jan 24, 2017
dwf reduced BS-4-1 Ductile Iron Pipe Bedding & Backfill Detail Jan 24, 2017
dwf_reduced BS-5 General Flexible Pipe Bedding Detail Jan 24, 2017
dwf reduced BS-5-1 Flexible Water Pipe Bedding  May 22, 2015
dwf_reduced BS-6 Ductile Iron Pipe Trench Section Jan 24, 2017
dwf_reduced BS-7 Sewer And Water Main Separation Oct 30, 2015
dwf reduced BS-8 Local/Residential/Collector Roadway Asphalt Patch Jan 24, 2017
dwf reduced BS-9 Major Arterial Roadway Asphalt Patch Jan 24, 2017
dwf reduced BS-10 Local/Residential/Collextor/Arterial Roadway Concrete Patch May 19, 2015
dwf reduced BS-11 Driveway Pavement Restoration October 20, 2015
dwf reduced BS-12 Pipe Bedding at Crossing Utility Conflicts May 22, 2015
dwf reduced BS-13 Structure Removal Patch  May 22, 2015