City Utilities Master Specifications are provided as a convenience and a tool for engineers doing work with or for the City Utilities. Master Specifications are provided to the Engineer with Notes to Specifier (NTS), throughout the documents. Each NTS identifies sections within the speciation that must be reviewed and edited by the Engineer. The Master Specifications are also referenced in Book 5 Materials MA2.04 Master Specifications.
City Utilities has standardized and updated its process for the development and use of Master Specifications as part of City Utilities projects. Learn more.....
 
CUE Master Specifications as of March 2018 -- zipped file includes all documents shown below
 

Number

Title Date Revised
 01 11 21  Miscellaneous Work Items                                          June 20, 2017
 01 31 19.13     Pre-Construction Meetings  June 20, 2017
 01 31 19.23  Progress Meetings  June 20, 2017
 01 32 16  Construction Progress Schedule  March 12, 2018
 01 33 00  Submittal Procedures  June 20, 2017
 01 52 03  Common Construction Facilities  June 20, 2017
 01 52 05  Detailed Construction Facilities  June 20, 2017
 01 55 26  Maintenance and Protection of Traffic  June 20, 2017
 01 57 00  Temporary Controls  March 12, 2018
 01 57 13  Erosion and Sedimentation Control  March 19, 2018
 01 65 00  Product Delivery Requirements  June 20, 2017
 01 66 00  Product Storage and Handling Requirements  June 20, 2017
 01 71 16.13  Video Documentation of Conditions  March 12, 2018
 01 71 23  Field Engineering  June 20, 2017
 01 71 33  Protection of the Work and Property  June 20, 2017
 01 75 11  Checkout and Startup Procedures  June 20, 2017
 01 77 00  Closeout Procedures  June 20, 2017
 01 78 23  Operations and Maintenance Data  June 20, 2017
 01 78 39  Project Record Documents  June 20, 2017
 03 00 05  Concrete  March 12, 2018
 05 56 00  Metal Castings  March 12, 2018
 26 05 05  General Provisions for Electrical Systems  Nov 16, 2018
 26 05 13  Medium Voltage Cables  Nov 16, 2018
 26 05 19  Low Voltage Electrical Power Conductors and Cables  Nov 16, 2018
 26 05 23  Instrumentation Cables  Nov 16, 2018
 26 05 26  Grounding and Bonding for Electrical Systems  Nov 16, 2018
 26 05 29  Hangers and Supports for Electrical Systems  Nov 16, 2018
 26 05 33  Raceways and Boxes for Electrical Systems  Nov 16, 2018
 26 05 43  Underground Ducts and Raceways for Electrical Systems  Nov 16, 2018
 26 05 53  Identification for Electrical Systems  Nov 16, 2018
 26 09 13 Electrical Power Monitoring  Nov 16, 2018
 26 09 23  Lighting Control Devices  Nov 16, 2018
 26 12 00  Medium Voltage Transformers
 Nov 16, 2018
 26 22 00  Low Voltage Transformers  Nov 16, 2018
 26 24 13  Switchboards  Nov 16, 2018
 26 24 16  Panelboards  Nov 16, 2018
 26 24 19  Motor Control Centers  Nov 16, 2018
 26 27 26  Wiring Devices  Nov 16, 2018
 26 28 13  Fuses  Nov 16, 2018
 26 28 16  Enclosed Switches and Circuit Breakers  Nov 16, 2018
 26 29 13  Motor Controllers  Nov 16, 2018
 26 29 23  Low Voltage Variable Frequency Drives  June 20, 2017
 26 43 13  Surge Protection Devices  Nov 16, 2018
 26 51 00  Interior Lighting  Nov 16, 2018
 26 56 00  Exterior Lighting  Nov 16, 2018
 27 00 00  Communications  June 20, 2017
 27 05 53  Identification for Communication Systems  June 20, 2017
 27 11 16  Communication Enclosures  June 20, 2017
 27 13 24  Fiber Optic Cable and Appurtenances  June 20, 2017
 27 15 13  Copper Cable and Appurtenances  June 20, 2017
 31 00 05   Trenching and Earthwork  March 12, 2018
 31 05 19  Geosynthetics for Earthwork  March 12, 2018
 31 11 00  Clearing and Grubbing  June 20, 2017
 31 32 20  Channel Protection Systems  March 12, 2018
 31 32 21  Vegetated Coir Logs  March 12, 2018
 31 36 10  Gabions and Revetment Mattresses  March 12, 2018
 32 05 19.19  Geogrids for Exterior Improvements  March 12, 2018
 32 12 16  Asphalt Paving  March 12, 2018
 32 13 00  Rigid Paving  June 20, 2017
 32 13 43  Pervious Rigid Paving  June 20, 2017
 32 16 00  Curbs, Gutters, Sidewalks, Ramps and Driveways  March 12, 2018
 32 90 00  Planting  March 12, 2018
 32 92 00  Lawns and Grasses  March 12, 2018
 33 01 30.73  Pipe Rehabilitation by Cured In Place Lining  June 20, 2017
 33 01 30.74  Pipe Repair and Replace by Open Excavation  June 20, 2017
 33 01 30.78  Rehabilitation of Sewer Manholes  June 20, 2017
 33 05 13.29  Fiberglass Manholes and Structures  June 20, 2017
 33 05 23.13  Utility Horizontal Directional Drilling  June 20, 2017
 33 05 23.16  Utility Pipe Jacking  June 20, 2017
 33 05 33  Ductile Iron Pressure Utility Piping  June 20, 2017
 33 05 33.13  Ductile Iron Non-Pressure Utility Piping  June 20, 2017
 33 05 34.13  Concrete Non-Pressure Utility Piping  March 12, 2018
 33 05 34.15  Concrete Pressure Utility Piping  June 20, 2017
 33 05 37.13  PVC Non-Pressure Utility Piping  June 20, 2017
 33 05 37.16  PVC Pressure Utility Piping  June 20, 2017
 33 05 38.13  HDPE Non-Pressure Utility Piping  June 20, 2017
 33 05 38.16  HDPE Pressure Utility Piping  March 12, 2018
 33 05 39  FRP Non-Pressure Utility Piping  June 20, 2017
 33 05 41  CMP Non-Pressure Utility Piping  June 20, 2017
 33 05 51  PP Non-Pressure Utility Piping  June 20, 2017
 33 11 00  Water Piping Installation  March 12, 2018
 33 12 00  Water Appurtenances  March 12, 2018
 33 31 00  Sanitary Sewer Piping Installation  March 12, 2018
 33 32 19  Public Utility Wastewater Pumping Stations  June 20, 2017
 33 39 13  Sanitary Utility Sewerage Manholes  June 20, 2017
 33 41 00  Storm Utility Piping Installation  June 20, 2017
 33 44 13  Drainage Structures  March 12, 2018
 33 46 16.19  Pipe Underdrains  June 20, 2017
 33 47 32  Rain Garden Construction  June 20, 2017
 33 49 13  Storm Drainage Manholes  March 12, 2018
 40 05 06  Couplings, Adapters, and Specials for Process Piping  June 20, 2017
 40 61 13  Process Control Systems General Provisions  June 20, 2017
 40 61 16  Process Control Narrative  June 20, 2017
 40 61 63  Process Control System- Training  June 20, 2017
 40 61 93  Process Control System- Input/Output List  June 20, 2017
 40 61 93  Schedules IO List  June 20, 2017
 40 64 00  Programable Logic Controllers  June 20, 2017
 40 67 03  Control System Equipment Panel Construction  June 20, 2017
 40 67 06  Misc. Control Panel Devices  June 20, 2017
 40 7x xx  Template for Instrumentation  June 20, 2017