Type NumberTitleRelease Date
dwf_reduced BS-1 Recommended Utility Placement in Public Right-of-Way Jan 24, 2017
dwf_reduced BS-2 Recommended Utility Placement in Back to Back Easement Jan 24, 2017
dwf_reduced BS-3 Recommended Utility Placement in Existing Perimeter Easement Jan 24, 2017
dwf_reduced BS-4 General Rigid Pipe Bedding Detail Jan 24, 2017
dwf reduced BS-4-1 Ductile Iron Pipe Bedding & Backfill Detail Jan 24, 2017
dwf_reduced BS-5 General Flexible Pipe Bedding Detail Jan 24, 2017
dwf reduced BS-5-1 Flexible Water Pipe Bedding  May 22, 2015
dwf_reduced BS-6 Ductile Iron Pipe Trench Section Jan 24, 2017
dwf_reduced BS-7 Sewer And Water Main Separation Oct 30, 2015
dwf reduced BS-8 Local/Residential/Collector Roadway Asphalt Patch Jan 24, 2017
dwf reduced BS-9 Major Arterial Roadway Asphalt Patch Jan 24, 2017
dwf reduced BS-10 Local/Residential/Collextor/Arterial Roadway Concrete Patch May 19, 2015
dwf reduced BS-11 Driveway Pavement Restoration October 20, 2015
dwf reduced BS-12 Pipe Bedding at Crossing Utility Conflicts May 22, 2015
dwf reduced BS-13 Structure Removal Patch  May 22, 2015

Sanitary Specific

Type NumberTitleRevised Date
dwf_reduced C-1-1 24" Sanitary Casting  June 12, 2014
dwf_reduced C-1-2

24" Sanitary Low-Profile Casting  

May 10, 2017
dwf_reduced C-2-1 24' Watertight Sanitary Casting  Aug 22, 2013
dwf_reduced C-2-2 Watertight Sanitary Casting  June 12, 2014
dwf_reduced C-3-1 12' Cleanout Casting  June 12, 2014
dwf_reduced C-3-2 12' Cleanout Casting  June 12, 2014
dwf_reduced C-4-2 24" Storm Low-Profile Casting May 10, 2017

 

Stormwater Specific

Type NumberTitleRevised Date
dwf_reduced C-4-1 24" Solid Storm Casting  June 12, 2014
dwf_reduced C-5-1 24' Watertight Storm Casting  Aug 8, 2013
dwf_reduced C-5-2 24' Watertight Storm Casting  June 12, 2014
dwf_reduced C-6-1 24" Storm Casting  June 12, 2014
dwf_reduced C-7-1 24" Beehive Casting  Jan 24, 2017
dwf_reduced C-8-1 30" x 30" Beehive Grate Oct 23, 2015 
dwf_reduced C-8-2 30" x 30" Beehive Grate Oct 23, 2015 
dwf_reduced C-9-1 2' x 2' Alley Casting Oct 28, 2015 
dwf_reduced C-9-2 2' x 2' Alley Casting Oct 28, 2015 
dwf_reduced C-10-1 2' x 2' Curb and Gutter Casting Oct 28, 2015 
dwf_reduced C-10-2 2' x 2' Curb and Gutter Casting Oct 28, 2015 
dwf_reduced C-10-3 2' x 2' Curb and Gutter Casting Oct 28, 2015 
dwf_reduced C-10-4 2' x 2' Curb and Gutter Casting Oct 28,2015 
dwf_reduced C-10-5 2' x 2' Curb and Gutter Casting Oct 30, 2015 
dwf_reduced C-10-6 2' x 2' Curb and Gutter Casting Oct 28, 2015 
dwf_reduced C-11-1 2' x 3' Curb and Gutter Casting Oct 28, 2015 
dwf_reduced C-11-2 2' x 3' Curb and Gutter Casting Oct 28, 2015 
dwf_reduced C-11-3 2' x 3' Curb and Gutter Casting  Jan 24, 2017
dwf_reduced C-11-4 2' x 3' Curb and Gutter Casting Oct 28, 2015
dwf_reduced C-11-5 2' x 3' Curb and Gutter Casting Nov 4, 2015
pdf-15 dwf reduced C-11-6 2' x 3' Approach Casting Jan 24, 2017
pdf-15 dwf reduced C-11-7 2' x 3' Approach Casting June 28, 2016
dwf_reduced C-12-1 33" Round Curb & Gutter Casting Oct 28, 2015
dwf_reduced C-12-2 33" Round Curb & Gutter Casting Oct 28, 2015
dwf_reduced C-12-3 33" Round Curb & Gutter Casting Oct 28, 2015
dwf reduced C-13-1 36" Storm Casting  Mar 27, 2019
dwf reduced C-14-1
Pick Hole Plug For Pick Hole
For Neenah Castings (NF-9204-A)              

Sept 9, 2015

ADA Compliance

dwf reduced C-15-1  22" x 22" ADA Casting Feb 21, 2018
dwf reduced C-15-2  22" x 22" ADA Casting Feb 21, 2018
dwf reduced C-16-1  24" x 46" ADA Casting Feb 21, 2018
dwf reduced C-16-2  24" x 46" ADA Casting Feb 21, 2018
dwf reduced C-17-1  24" x 46" ADA Casting Feb 21, 2018
dwf reduced C-17-2  24" x 46" ADA Casting Feb 21, 2018
dwf reduced C-18-1  24" x 46" Low Profile ADA Casting Feb 21, 2018
dwf reduced C-18-2  24" x 46" Low Profile ADA Casting Feb 21, 2018
dwf reduced C-19-1  24" x 24" ADA Casting Feb 21, 2018
dwf reduced C-19-2  24" x 24" ADA Casting Feb 21, 2018
dwf reduced C-20-1  2' x 3' ADA Casting Feb 21, 2018
dwf reduced C-20-2  2' x 3' ADA Casting Feb 21, 2018
dwf reduced C-21-1  30" x 30" ADA Casting Feb 21, 2018
dwf reduced C-21-2  30" x 30" ADA Casting Feb 21, 2018
dwf reduced C-22-1  30" Round ADA Casting Feb 21, 2018
dwf reduced C-22-2  30" Round ADA Casting Feb 21, 2018
dwf reduced C-23-1  26" x 26" Low Profile ADA Casting Feb 21, 2018
dwf reduced C-23-2  26" x 26" Low Profile ADA Casting Feb 21, 2018
dwf reduced C-24-1  24" ADA Casting Feb 21, 2018
dwf reduced C-24-2  24" ADA Casting Feb 21, 2018
dwf reduced C-25-1  12" x 24" ADA Casting Feb 21, 2018
dwf reduced C-25-2  12" x 24" ADA Trench Grate Feb 21, 2018
dwf reduced C-26-1  14" x 24" ADA Trench Grate Feb 21, 2018
dwf reduced C-26-2  14" x 24" ADA Trench Grate Mar 26, 2018

 

 

Type
  Number
Title
Revised Date
pdf-15
dwf_reduced SAN-1 Building Sewer Connection Layout Sept 6, 2013
pdf-15 dwf reduced SAN-1-1 Building Sewer Standard For Crossing Street Mar 27, 2015
pdf-15 dwf reduced SAN-2 Building Adaptor and Cleano Dec 3, 2014
pdf-15 dwf_reduced SAN-3
Standard Sanitary Cleanout
Oct 28, 2015
pdf-15 dwf reduced  SAN-4
Shallow Service Connection
Feb 28, 2018
pdf-15 dwf reduced  SAN-5
Deep Service Connection
Jan 19, 2017
pdf-15 dwf reduced  SAN-6
Cut-in Wye Method

Dec 3, 2014

pdf-15 dwf reduced  SAN-7
Saddle Connection
Jan 25, 2017
pdf-15 dwf reduced SAN- 8
 Sewer Distance From Well
Oct 30, 2015
pdf-15 dwf_reduced SAN-9-1
Low Pressure Forcemain Cleanout Terminal 
Aug 26, 2016
pdf-15 dwf_reduced SAN-9-2
Low Pressure Force Main Cleanout Inline
Aug 26, 2016
pdf-15 dwf reduced  SAN-9-3
Grinder Pump Station And Pressure Building Sewer Installation
Dec 20, 2017
pdf-15 dwf reduced SAN-11
Building Sewer Lowering
May 22, 2015

Type NumberTitleRelease Date
pdf-15 dwf_reduced EROS-1 Temporary Construction Entrance Febr 9, 2015
pdf-15 dwf_reduced EROS-2-1 Temporary Perimeter Protection Silt Fence July 1, 2013
pdf-15 dwf_reduced EROS-2-2 Temporary Perimeter Protection Filter Sock Aug 9, 2013
pdf-15 dwf_reduced EROS-3-1 Concrete Washout - Above Grade Aug 9, 2013
pdf-15 dwf_reduced EROS-3-2 Concrete Washout - Below Grade Aug 9, 2013
pdf-15 dwf_reduced EROS-4-1 Erosion Control Blankets - Channel Oct 30, 2015
pdf-15 dwf_reduced EROS-4-2 Erosion Control Blankets - Slope Aug 9, 2013
pdf-15 dwf_reduced EROS-4-3 Erosion Control Blankets - Shoreline Aug 9, 2013
pdf-15 dwf_reduced EROS-5 Temporary Rock Check Dam Aug 9, 2013 
pdf-15 dwf_reduced EROS-5-2 Temporary HDPE Check Dan Feb 28, 2018
pdf-15 dwf_reduced EROS-6-1    Temporary Inlet Protection - Geotextile Fabric July 1, 2013
pdf-15 dwf_reduced EROS-6-2 Temporary Inlet Protection - Sediment Control Sack Aug 9, 2013
pdf-15 dwf_reduced EROS-6-3 Temporary Inlet Protection - Stone Bags Ring - Sump Aug 9, 2013
pdf-15 dwf_reduced EROS-6-4 Temporary Inlet Protection - Stone Bags Ring - Sump with Curb Aug 9, 2013
pdf-15 dwf_reduced EROS-6-5 Temporary Inlet Protection - Stone Bags - Slope Gradient with Curb        Aug 9, 2013
pdf-15 dwf_reduced EROS-6-6 Temporary Inlet Protection - Filter Sock Aug 9, 2013
pdf-15 dwf_reduced EROS-6-7 Temporary Inlet Protection - Straw Bales Octr 30, 2015
pdf-15 dwf_reduced EROS-6-8 Temporary Inlet Protection - Latex Bound Coir Mat Feb 28, 2018
pdf-15 dwf_reduced EROS-7 Temporary Sediment Trap Aug 9, 2013
pdf-15 dwf_reduced EROS-8 Temporary Sediment Control Dewatering Bag July 1, 2013
pdf-15 dwf_reduced EROS-9-1 Temporary River/Lake Shore Protection - Coir Logs July 1, 2013
pdf-15 dwf reduced EROS-9-2  River/Lake Shore Protection Gabions Feb 26, 2018
pdf-15 dwf reduced EROS-9-3  Rver/Lake Shore Protection Gabions on Gabion Mattress Feb 26, 2018
pdf-15 dwf reduced EROS-9-4 River/Lake Shore Protection Gabions Next To Gabion Mattress Feb 26, 2018
pdf-15 dwf_reduced EROS-10 Temporary 48" Construction Fence July 2, 2013

 

 

Type NumberTitleDate Revised
dwf_reduced SW-1 Swale Underdrain October 30, 2015 
dwf_reduced SW-2 Curb Underdrain October 28, 2015 
dwf_reduced SW-3 Waterway Cross-Section October 30, 2015 
dwf reduced SW-4 Typical Placement Of Inlets At Intersections May 22, 2015
  dwf reduced  SW-5-1 Trench Drain I August 5, 2014
  dwf reduced  SW-5-2 Trench Drain II August 5, 2014
dwf reduced SW-6 Ditch Details  October 28, 2015